References

Project

Ward Rd TOD Street
52nd Ave. & Ward Road
Wheat Ridge

Owner

City of Wheat Ridge
Tom Gray
(303) 887-5766

7500 W. 29th Ave.
Wheat Ridge CO 80033

Architect

SAME

Contract Amount
$6,330,145.22

Completion
04/15/2024

Goodland was contracted to complete a total reconstruction of 1/2 miles of roadway along 52nd Ave. between Ward Rd. and Tabor St. The entire asphalt road was removed and replaced including new concrete sidewalks, ramps, and 4,330 LF of curb & gutter. New waterline, 12” to 42” RCP storm pipe, new inlets, manholes, and fire hydrants replaced the old systems. New light poles and traffic signals were installed and then new landscape and irrigation finished off this impressive project.

Project

S. Boulder Road Crossing
S. Boulder Road At Grade Crossing
Louisville

Owner

City of Louisville
Geoff Nettleton
(303) 666-6565

749 Main Street
Louisville CO 80027

Architect

SAME

Contract Amount
$1,455,763.49

Completion
12/31/2023

Improving pedestrian traffic flow, 5 intersections were removed and replace with pedestrian friendly signing, striping, new ramps and traffic signal modifications. Then concrete, asphalt and landscape repairs were completed.

Project

Kipling Signal Upgrades
Kipling St. & 10th Ave.
Lakewood

Owner

City of Lakewood
Steven Steinberger
(303) 987-7900

480 S Allison Parkway
Lakewood CO 80226-3127

Architect

SAME

Contract Amount
$3,034,272.88

Completion
11/30/2023

Work on this project included new traffic signals at 3 locations along Kipling. To accommodate these improvements removal of the existing corners included demolition of the existing signals, concrete, asphalt and the adjacent landscape. Then new ramps, sidewalk, curb & gutter, asphalt and new signals were installed. New medians were also designed to improve pedestrian traffic and then restoration to the surrounding landscape was done.

Project

Loretto Heights
West Bates Ave & South Federa
Denver

Owner

Thrive Home Builders
Paul Herman
(720) 209-9601

1875 Lawrence St. #900
Denver CO 80202

Architect

Harris Kocher Smith
John Stafford
(303) 623-6300
1120 Lincoln St. #1000
Denver CO 80203

Contract Amount
$1,959,568.03

Completion
11/01/2023

Loretto Heights is a 75-acre infill redevelopment lead by Westside Investments and the Loretto Heights Metropolitan District. Thrive Home Builders then purchased approximately 26 acres from Westside in the form of graded and fully serviced superpads. Goodland performed the overlot grading, utilitity and concrete work which included; overexcavation and compaction of the site, installation of water lines, sanitary and storm sewer installation and the installation of the concrete alleyways and sidewalks.

Project

Lima St Sidewalk
2307 S. Lima St.
Aurora

Owner

City of Aurora
Jana Krell
(303) 739-7640

15151 E. Alameda Parkway
Aurora CO 80012

Architect

SAME

Contract Amount
$802,444.00

Completion
09/30/2023

Reconstruction of an existing sidewalk with a width of 3 1/2 ft to 6 ft was completed along Lima Street starting at Wesley Ave. The removal and replacement of the sidewalk, curb ramps and pedestrian crossing were needed to meet the current city standards.

Project

104th Street Trail/Louisville
Coal Creek Trail & Empire Road
Louisville

Owner

City of Louisville
Geoff Nettleton
(303) 666-6565

749 Main Street
Louisville CO 80027

Architect

SAME

Contract Amount
$1,463,622.38

Completion
07/30/2023

A new soft surface and concrete trail was built along 104th St. to add upon Louisville's impressive trail system. An extensive traffic control plan had to be approved to accommodate traffic and during construction new fencing and drainage piping was installed.

Project

Superior Plaza
Main St & Superior Drive
Superior

Owner

RC Superior, LLC c\o Ranch Cap
Jessica Sergi
(858) 523-1799

3830 Valley Centre Dr
San Diego CA 92130

Architect

Civil Resources
Jim Brzostowicz
(303) 833-1416
323 5th St.
Frederick CO 80530

Contract Amount
$5,315,086.16

Completion
12/01/2022

The development of Superior’s new downtown was a real challenge. The two square blocks were filled with a concrete plaza, 300 LF of concrete seat walls, water fountain, play equipment, site furnishings, and landscape. Many areas were designed with five-foot walls and steps for the necessary grade changes. To accommodate these features the new streets that surrounded the plaza had to be retrofitted with the necessary water, sanitary and storm lines.

Project

Superior Blocks 26 & 27
Central Park Circle & Discove
Superior

Owner

RC Superior, LLC c\o Ranch Cap
Jessica Sergi
(858) 523-1799

3830 Valley Centre Dr
San Diego CA 92130

Architect

Civil Resources
Jim Brzostowicz
(303) 833-1416
323 5th St.
Frederick CO 80530

Contract Amount
$2,697,891.00

Completion
12/31/2022

The future place of 48 new homes, Goodland completed the entire infrastructure build out for this new Superior Residential site. Exporting 1,500 CY’s of soil and Cut & Fill an additional 750 CY’s was needed to complete the earthwork including the necessary subgrade prep. Then 770 LF new 24”/15”/12”/10” storm pipe was installed with all the inlet and manhole connections. Concrete sidewalks, curb & gutter, and driveway cuts were then constructed and then new street lighting finished this new development.

Project

Broadway & Plaza Intersection
Broadway & Plaza Dr.
Douglas County

Owner

Douglas County
Karl Lucero
(303) 660-7490

100 Third St
Castle Rock CO 80104-

Architect

SAME

Contract Amount
$1,748,790.17

Completion
10/01/2022

The entire intersection was removed for these improvements. An upgrade to the signal lights were completed including concrete roadway pavement, concrete sidewalks and curb & gutter, asphalt patching and then new landscape finished off this extensive project.

Project

Superior Town Center
McCaslin Rd & Main St
Superior

Owner

RC Superior, LLC c\o Ranch Cap
Jessica Sergi
(858) 523-1799

3830 Valley Centre Dr
San Diego CA 92130

Architect

Civil Resources
Jim Brzostowicz
(303) 833-1416
323 5th St.
Frederick CO 80530

Contract Amount
$2,804,707.63

Completion
12/31/2021

Goodland Construction was contracted to get two blocks "Pad Ready" in the new Superior Town Center. Utility work included installing over 1,300 feet of new sewer line and 1,900 feet of 8" waterline with 48 new water services. Concrete included new curb and gutter, sidewalks and alleys. Goodland self performed all of the utility, earthwork, concrete and landscape on this project.

Project

48th Ave TOD Improvements
E 48th Ave.
Denver

Owner

John LaSala
(303) 913-4534

201 W. Colfax Ave
Denver CO 80202

Architect

SAME

Contract Amount
$2,009,152.72

Completion
12/01/2021

Upgrading an old sanitary system for six blocks along 48th Ave. Goodland removed half of the street to install 600 LF of 15” RCP, 400 LF of 18” RCP, 525 LF of 24” RCP, and 200 LF of 36” RCP, including numerous inlets and manholes. Included in the upgrade was new sidewalk and curb and gutter along the south side and to finish off the work the north side of the street was rotomilled and the entire street was paved with new asphalt.

Project

Eastlake South
124th Ave. & York St.
Thornton

Owner

City of Thornton
Jim Jensen
(303) 538-7234

9500 Civid Center Dr
Thornton CO 80229

Architect

SAME

Contract Amount
$1,113,887.85

Completion
07/01/2021

Construction of new parking lot to accommodate the new RTD light rail station at 1st St. & E. 124th Ave. included a new asphalt parking lot with striping, including all the necessary earthwork. Then a new concrete sidewalk and curb and gutter was installed, including a extensive concrete stairway and ramp to meet the rail platform. New pedestrian lighting, landscape and irrigation made this project a beautiful landing for RTD riders.

Project

88th Street Improvements
88th St from Rock Creek Pkwy
Superior

Owner

Town of Superior
Rick Davis
(303) 887-5766

124 E. Coal Creek Dr
Superior CO 80027

Architect

J&T Consulting
Jason Murray
303-857-6222
305 Denver Ave. Suite D
Fort Lupton, CO 80621

Contract Amount
$3,164,658.98

Completion
10/01/2020

To improve traffic flow on 88th Ave. major changes were designed that included widening the entire road, adding roundabouts, new crosswalks and pedestrian islands. To accommodate the new development in the area, utility work including a new water main and stub outs, new storm and sanitary sewer was installed.

Project

Meadows Park
2131 Low Meadow Blvd
Castle Rock

Owner

Town of Castle Rock
Brian Peterson
(303) 814-7452

100 N. Wilcox St.
Castle Rock, CO 80104

Architect

SAME

Contract Amount
$2,575,727.77

Completion
09/01/2019

This new 8 acre park is designed to accommodate the surrounding neighborhood. Included are all the key elements of a high class park. A new playground with site furnishings, a new shelter and restroom for picnics and for the active residents a new pickelball court. New lighting was designed throughout the park and concrete sidewalks and plazas connected it all together. To put the finishing touches on this beautiful park new landscape and irrigation was installed.

Project

Eastlake Station
E. 124th & Claude Ct.
Thornton

Owner

City of Thornton
Al Alva
(303) 845-0047

9500 Civic Center Dr.
Thornton, CO 80229

Architect

Valerian LLC
Stacey Stickler
(303) 347-1200
6300 S. Syracuse Way #600
Centennial CO 80111

Contract Amount
$1,710,371.65

Completion
06/01/2019

To accommodate the new light rail coming through this gateway plaza invites RTD riders coming off the platform concrete walls were creatively designed to bring the riders into this beautiful space with planters, seat walls, site amenities, and new lighting. Added to this project is upgrading the road along this new plaza including a new storm sewer service.

Project

Star Meadows Park
Flatiron Meadow Blvd
Erie

Owner

Town of Erie
Farrell Buller
(303) 926-2792

645 Holbrook St
Erie CO 80516

Architect

Design Concepts CLA,Inc.
Shanen Weber
(303) 664-5301
211 N. Public Rd. 100
Lafayette CO 80026

Contract Amount
$2,095,859.50

Completion
04/15/2018

A new 8 acre park for the Town of Erie will have the residence enjoying all types of activities. A big grass area and basketball court for sports and custom playgrounds for the kids. The town decided to make this park special by designing custom play pieces and custom shelters complimented with colored pattern concrete and a solar summit climbing hill with an engraved sun dial at the top. Other features include a stainless steel sphere, slackline balance cable and to top off these exciting features fiber optic lights will shine through the concrete in a radiating pattern.

Project

Colfax & Lipan Improvements
Colfax & LIpan Intersection
Denver

Owner

City & County of Denver-PW
John LaSala
(720) 913-4534
201 W. Colfax Ave.
Denver CO 80202

Architect

Felsburg, Holt, Ullevig
6300 S Syracuse Way #600
Centennial, CO 80111

Contract Amount
$1,636,145.93

Completion
03/01/2018

To continue Denver's entryway to downtown the unique medians that were installed between Speer Blvd. and Broadway will continue west to Mariposa Street. New medians will be installed in these two blocks including traffic signal adjustments, intersection and bus lane improvements and new landscape and irrigation.

760 Nile Street
Golden, CO 80401